Duerr, D (1990) Lift of Shippingport Reactor Pressure Vessel. Journal of Construction Engineering and Management, 116(01), 188–97.

Eldin, N N and Egger, S (1990) Productivity Improvement Tool: Camcorders. Journal of Construction Engineering and Management, 116(01), 100–11.

Householder, J L and Rutland, H E (1990) Who Owns Float?. Journal of Construction Engineering and Management, 116(01), 130–3.

Jaafari, A and Schub, A (1990) Surviving Failures: Lessons from Field Study. Journal of Construction Engineering and Management, 116(01), 68–86.

Jayawardane, A K W and Harris, F C (1990) Further Development of Integer Programming in Earthwork Optimization. Journal of Construction Engineering and Management, 116(01), 18–34.

  • Type: Journal Article
  • Keywords: Optimization models; Linear programming; Road construction; Earthwork;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1990)116:1(18)
  • Abstract:
    The objective of existing linear programming methods of earthwork‐system optimization in road construction has been either minimizing the cost or maximizing profit, generally without considering the project duration. This paper develops a linear programming model incorporating the project duration. The model attempts to optimize a comprehensive earthmoving system in road construction by comparing alternative fleets (from available fleets) to provide an optimum material distribution and appropriate plant fleets to complete a project within the specified time. The situations where different degrees of compaction, availability of various soil strata at cut sections and borrow pits, and selection of borrow/disposal sites are also incorporated. Among the possible extensions, equipment sharing between fleets and sequence of operations present at cut and fill sections are examined. The validity of the model is demonstrated by applying it to a numerical example, providing additional tools to the management such as the minimum project‐completion time, the cheapest project cost and corresponding duration achievable with available resources.

Laufer, A and Cohenca, D (1990) Factors Affecting Construction‐Planning Outcomes. Journal of Construction Engineering and Management, 116(01), 135–56.

Matsuzaki, M, Uchikawa, C and Mitamura, T (1990) Advanced Fabrication and Erection Techniques for Long Suspension Bridge Cables. Journal of Construction Engineering and Management, 116(01), 112–29.

Mohan, S (1990) Expert Systems Applications in Construction Management and Engineering. Journal of Construction Engineering and Management, 116(01), 87–99.

Oglesby, C H (1990) Dilemmas Facing Construction Education and Research in 1990s. Journal of Construction Engineering and Management, 116(01), 4–17.

Phelan, R S, Radjy, F, Haas, C and Hendrickson, C (1990) Computer‐Aided Concrete‐Placement Optimization. Journal of Construction Engineering and Management, 116(01), 172–87.

Russell, J S, Skibniewski, M J and Cozier, D R (1990) Qualifier‐2: Knowledge‐Based System for Contractor Prequalification. Journal of Construction Engineering and Management, 116(01), 157–71.

Singh, S (1990) Cost Model for Reinforced Concrete Beam and Slab Structures in Buildings. Journal of Construction Engineering and Management, 116(01), 54–67.

Stella, C, Ceppi, G and D'Appolonia, E (1990) Temporary Tunnel Support Using Jet‐Grouted Cylinders. Journal of Construction Engineering and Management, 116(01), 35–53.